Surface Preparation (Approx. 2 Hours)
Diamond grinding & full surface preparation. After that we repair cracks for a smooth base
Most epoxy floor coatings are completed in 1–2 days, depending on the selected system
Diamond grinding & full surface preparation. After that we repair cracks for a smooth base
Starting with light sanding, Clear 2-pack epoxy layer (where applicable) and clear polyurethane UV-resistant sealer for added durability
Starting with light sanding, clear 2-pack epoxy layer (where applicable) and clear polyurethane UV-resistant sealer for added durability
Enhance the look, functionality and value of your garage with Werribee’s trusted garage improvement specialists. We provide professional solutions designed to improve comfort, durability and style